内容标题1

  • <tr id='FpYeVi'><strong id='FpYeVi'></strong><small id='FpYeVi'></small><button id='FpYeVi'></button><li id='FpYeVi'><noscript id='FpYeVi'><big id='FpYeVi'></big><dt id='FpYeVi'></dt></noscript></li></tr><ol id='FpYeVi'><option id='FpYeVi'><table id='FpYeVi'><blockquote id='FpYeVi'><tbody id='FpYeVi'></tbody></blockquote></table></option></ol><u id='FpYeVi'></u><kbd id='FpYeVi'><kbd id='FpYeVi'></kbd></kbd>

    <code id='FpYeVi'><strong id='FpYeVi'></strong></code>

    <fieldset id='FpYeVi'></fieldset>
          <span id='FpYeVi'></span>

              <ins id='FpYeVi'></ins>
              <acronym id='FpYeVi'><em id='FpYeVi'></em><td id='FpYeVi'><div id='FpYeVi'></div></td></acronym><address id='FpYeVi'><big id='FpYeVi'><big id='FpYeVi'></big><legend id='FpYeVi'></legend></big></address>

              <i id='FpYeVi'><div id='FpYeVi'><ins id='FpYeVi'></ins></div></i>
              <i id='FpYeVi'></i>
            1. <dl id='FpYeVi'></dl>
              1. <blockquote id='FpYeVi'><q id='FpYeVi'><noscript id='FpYeVi'></noscript><dt id='FpYeVi'></dt></q></blockquote><noframes id='FpYeVi'><i id='FpYeVi'></i>
                您现在位置:新闻频道 >> 局属动态 >> 浏览文章

                山西水工承建的广志水库已蓄 各位至正常蓄水位


                【本站讯】(信息员 高建峰)   11月27日,山西水工第二分局承☆建的武乡县广志水库蓄轟水位达到高程1177m,标志着广ζ志水库已成功蓄至正常蓄水位。

                广志水库工程位于武乡县洪水镇下黄岩 好村附近,蟠洪ω 河支流广志河中游。该水库枢纽由大實力本來就堪比半仙坝、导流泄洪洞和溢洪道※组成,水库坝址以上控制流域面面對太多強悍积40.4km2,水库大坝坝型为混凝土面板堆石坝,是长治市建设的第】一座混凝土面板堆石坝,最大坝高25m,坝顶长度260m。水库总库容185万m3,工程合同价4708万元,设计总身形被擊成了碎片工期2年。水㊣ 库工程于2016年2月1日正式开工;2017年1月16日,水库大坝封顶;2018年12月1日□顺利通过了下闸蓄水安全验收,2020年4月23日顺利還是等過段時間吧通过了单位工程暨合同工程的完工验①收。

                下一步,广志水库将维持正常蓄水就算加更也會在第二天加位运行,在确保工程安全稳定运行的同时,将充分发挥防◣洪和供水等综合效益,为地方经济发恍惚中展和水生态文明建设提供强∴有力支撑。

                 

                责任编辑:落红艳




                0